{"id":3050,"date":"2024-11-07T09:00:51","date_gmt":"2024-11-07T08:00:51","guid":{"rendered":"https:\/\/tricera.proaspecto.com\/?post_type=portfolio&#038;p=3050"},"modified":"2024-11-07T09:01:06","modified_gmt":"2024-11-07T08:01:06","slug":"luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer","status":"publish","type":"portfolio","link":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/","title":{"rendered":"L\u00fcbars and Letschin innovation parks successfully handed over to municipal project developer"},"content":{"rendered":"<p><strong>Dresden, November 07, 2024<\/strong><\/p>\n<p>TRICERA energy, the general contractor (EPC) and system integrator for large-scale battery storage systems from Dresden, successfully completed the two innovation parks in L\u00fcbars and Letschin last week.<\/p>\n<p>Both projects were developed by Trianel Energieprojekte GmbH &amp; Co. KG. The 100% subsidiary of the municipal utility cooperation Trianel specializes in the development of operational wind and solar parks. The hybrid power plants have since been sold to a Bavarian investor.<\/p>\n<p>The two battery storage systems with a total installed capacity of 17.5 MWh and an output of 9.75 MW (4.55\/9.1 and 4.2\/8.4) participate in energy trading. The hybrid power plants consisting of a photovoltaic system and battery storage serve the new owner as an attractive investment in renewable energies.<\/p>\n<p>The projects resulting from the innovation tender are characterized by the fact that only automotive batteries were installed. While 1st life modules were used in Letschin, 2nd life modules were installed in L\u00fcbars. This is a particularly low-CO2 variant of energy storage, as resources that have already been invested can be used for longer, thus extending the life cycle of the battery modules. At the same time, a very high proportion of the added value comes from Germany and Europe.<\/p>\n<p>TRICERA was primarily responsible for the construction of the battery storage systems in the projects and provided the planning, procurement and installation of all components up to the transformer. TRICERA successfully completed the project with the handover of the documentation and preparation of the expert opinion by the certifier. The systems fully comply with the provisions of the innovation tender.<\/p>\n<p>The Federal Network Agency promotes particularly grid- or system-friendly, efficient plant combinations of various renewable energies (RE) as well as combinations of RE plants and storage facilities.<\/p>\n<p><strong>Background TRICERA energy<\/strong><\/p>\n<p>To a new era &#8211; that is the vision of TRICERA energy GmbH. The sustainable company based in Freiberg and Dresden specializes in the development, construction and operation of medium (&lt;500kWh) to large (&gt;2MWh) battery storage systems that can be equipped with both 1st and 2nd life batteries. Our flexibility enables a cost-optimized, demand-driven and renewable energy supply. The core business comprises three areas of expertise: Engineering and consulting, project development and system integration. With 90 employees consisting of leading experts in the battery industry and many years of experience in various fields of expertise, TRICERA energy is a qualified partner when it comes to the energy transition. To date, TRICERA has installed 196 megawatt-hours of capacity and 119 megawatts of power with 12 partners in 35 projects.<\/p>\n<p>Further information at: <a href=\"https:\/\/tricera.proaspecto.com\">https:\/\/tricera.energy<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>Contact person\u00a0<\/strong><\/p>\n<p>Philipp Berger<br \/>\nTelefon +49 151 57675400<br \/>\nphilipp.berger@tricera.energy<br \/>\nIndustriestra\u00dfe 65<br \/>\n01129 Dresden<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dresden, November 07, 2024<br \/>\nTRICERA energy, the general contractor (EPC) and system integrator for large-scale battery storage systems from Dresden, successfully completed the two innovation parks in L\u00fcbars and Letschin last week.<\/p>\n","protected":false},"author":10,"featured_media":3407,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_custom_body_class":"","_custom_post_class":"","footnotes":""},"portfolio_category":[54],"portfolio_tag":[],"class_list":["post-3050","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-press-release"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>L\u00fcbars and Letschin innovation parks successfully handed over<\/title>\n<meta name=\"description\" content=\"TRICERA energy successfully completed two innovation parks in L\u00fcbars and Letschin with capacity of 17.5 MWh and output of 9.75 MW last week.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"L\u00fcbars and Letschin innovation parks successfully handed over\" \/>\n<meta property=\"og:description\" content=\"TRICERA energy successfully completed two innovation parks in L\u00fcbars and Letschin with capacity of 17.5 MWh and output of 9.75 MW last week.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/\" \/>\n<meta property=\"og:site_name\" content=\"TRICERA energy\" \/>\n<meta property=\"article:modified_time\" content=\"2024-11-07T08:01:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-15-web.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/\",\"url\":\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/\",\"name\":\"L\u00fcbars and Letschin innovation parks successfully handed over\",\"isPartOf\":{\"@id\":\"https:\/\/tricera.proaspecto.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-17-web.jpg\",\"datePublished\":\"2024-11-07T08:00:51+00:00\",\"dateModified\":\"2024-11-07T08:01:06+00:00\",\"description\":\"TRICERA energy successfully completed two innovation parks in L\u00fcbars and Letschin with capacity of 17.5 MWh and output of 9.75 MW last week.\",\"breadcrumb\":{\"@id\":\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#primaryimage\",\"url\":\"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-17-web.jpg\",\"contentUrl\":\"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-17-web.jpg\",\"width\":2000,\"height\":1333},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/tricera.proaspecto.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portfolio\",\"item\":\"https:\/\/tricera.proaspecto.com\/presse\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"L\u00fcbars and Letschin innovation parks successfully handed over to municipal project developer\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/tricera.proaspecto.com\/#website\",\"url\":\"https:\/\/tricera.proaspecto.com\/\",\"name\":\"TRICERA energy\",\"description\":\"Innovative Batteriespeicher f\u00fcr Energieprojekte und Netzbetreiber\",\"publisher\":{\"@id\":\"https:\/\/tricera.proaspecto.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/tricera.proaspecto.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/tricera.proaspecto.com\/#organization\",\"name\":\"TRICERA energy\",\"url\":\"https:\/\/tricera.proaspecto.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/tricera.proaspecto.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/02\/logo-yoast@2x.png\",\"contentUrl\":\"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/02\/logo-yoast@2x.png\",\"width\":696,\"height\":696,\"caption\":\"TRICERA energy\"},\"image\":{\"@id\":\"https:\/\/tricera.proaspecto.com\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"L\u00fcbars and Letschin innovation parks successfully handed over","description":"TRICERA energy successfully completed two innovation parks in L\u00fcbars and Letschin with capacity of 17.5 MWh and output of 9.75 MW last week.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/","og_locale":"en_US","og_type":"article","og_title":"L\u00fcbars and Letschin innovation parks successfully handed over","og_description":"TRICERA energy successfully completed two innovation parks in L\u00fcbars and Letschin with capacity of 17.5 MWh and output of 9.75 MW last week.","og_url":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/","og_site_name":"TRICERA energy","article_modified_time":"2024-11-07T08:01:06+00:00","og_image":[{"width":2000,"height":1333,"url":"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-15-web.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/","url":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/","name":"L\u00fcbars and Letschin innovation parks successfully handed over","isPartOf":{"@id":"https:\/\/tricera.proaspecto.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#primaryimage"},"image":{"@id":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#primaryimage"},"thumbnailUrl":"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-17-web.jpg","datePublished":"2024-11-07T08:00:51+00:00","dateModified":"2024-11-07T08:01:06+00:00","description":"TRICERA energy successfully completed two innovation parks in L\u00fcbars and Letschin with capacity of 17.5 MWh and output of 9.75 MW last week.","breadcrumb":{"@id":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#primaryimage","url":"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-17-web.jpg","contentUrl":"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/11\/240722-luebars_drohne-17-web.jpg","width":2000,"height":1333},{"@type":"BreadcrumbList","@id":"https:\/\/tricera.proaspecto.com\/en\/luebars-and-letschin-innovation-parks-successfully-handed-over-to-municipal-project-developer\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/tricera.proaspecto.com\/en\/"},{"@type":"ListItem","position":2,"name":"Portfolio","item":"https:\/\/tricera.proaspecto.com\/presse\/"},{"@type":"ListItem","position":3,"name":"L\u00fcbars and Letschin innovation parks successfully handed over to municipal project developer"}]},{"@type":"WebSite","@id":"https:\/\/tricera.proaspecto.com\/#website","url":"https:\/\/tricera.proaspecto.com\/","name":"TRICERA energy","description":"Innovative Batteriespeicher f\u00fcr Energieprojekte und Netzbetreiber","publisher":{"@id":"https:\/\/tricera.proaspecto.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tricera.proaspecto.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/tricera.proaspecto.com\/#organization","name":"TRICERA energy","url":"https:\/\/tricera.proaspecto.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/tricera.proaspecto.com\/#\/schema\/logo\/image\/","url":"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/02\/logo-yoast@2x.png","contentUrl":"https:\/\/tricera.proaspecto.com\/wp-content\/uploads\/2024\/02\/logo-yoast@2x.png","width":696,"height":696,"caption":"TRICERA energy"},"image":{"@id":"https:\/\/tricera.proaspecto.com\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/portfolio\/3050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/comments?post=3050"}],"version-history":[{"count":2,"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/portfolio\/3050\/revisions"}],"predecessor-version":[{"id":3060,"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/portfolio\/3050\/revisions\/3060"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/media\/3407"}],"wp:attachment":[{"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/media?parent=3050"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/portfolio_category?post=3050"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/tricera.proaspecto.com\/en\/wp-json\/wp\/v2\/portfolio_tag?post=3050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}